MENGWEI logo

Case Studies > Cold Storage Panel Manufacturer Stabilizes Production Through Monsoon Season

IndonesiaCold Storage Panel ManufacturingRapid Response

Cold Storage Panel Manufacturer Stabilizes Production Through Monsoon Season

ā€œWe stopped baby-sitting the line every time the weather changes.ā€- Production Manager

Challenge

A regional sandwich panel manufacturer in East Java, referred to here as PT S— P—, operates a continuous lamination line producing PIR/PUR cold storage panels for the Southeast Asian refrigeration market. Every monsoon season, when ambient humidity broke past 85%, their existing rigid PU system became erratic: cream time drifted by 2-3 seconds across shifts, gel time stretched from 45 to 60+ seconds, and surface defects climbed above 4%. Quality rejects ate into already-thin margins.

Their previous supplier offered only one solution: adjust the line speed. That was not an answer.

Approach

The customer shipped a 2-liter sample of their existing system to our Jinshan laboratory, along with twelve months of cream time data and ambient humidity logs. Within five days, our R&D chemists reformulated the catalyst balance and adjusted the surfactant package while keeping the customer's existing polymeric MDI, solving the moisture sensitivity on the polyol side.

The reformulated system was validated on the customer's continuous line during peak February humidity.

Outcome

  • Cream time stabilized at 12 +/- 1 seconds across humidity ranges from 60% to 92%
  • Surface defect rate dropped from above 4.0% to under 0.8%
  • B2 fire-retardant compliance maintained per Indonesian SNI standards
  • Migrated to MENGWEI as primary rigid PU supplier in Q3 2024
  • Now shipping 2 containers per month on recurring schedule
Project Tags
PT S— P—Cold Storage Panel ManufacturingSoutheast AsiaRigid Polyurethane Systems200-300 tons annuallyYear 2
Learn more about Rigid Polyurethane Systems

Discuss a similar project with our team

Share your application, current challenge, and target specifications. Our technical team will respond within one business day.

Request a Quote